How does one submit a GS Transition Template for Transitioning From CDM (or transition from any other carbon standard)?
Step 1) Confirm
a Gold Standard Registry Account has been opened and the account is active (How to Open a Gold Standard Registry
Account?)
Step
2) Confirm an SC Platform Account is opened and
login name and password are available
Step 4) Communicate
here, going forward, with the SustainCERT certification team
Step 6) Look
for your invoice. Once a review date is confirmed by our certification team,
you will get an invoice by email (How is an invoice generated by SustainCERT). After a review is booked in the SC Platform, the invoice
is triggered 30 days prior to the review date. Thus, if the review date
is less than 30 days from the booking date, the invoice will be issued right
away. The review is technically not allowed to commence until the payment
is received and the documentation is in good order Step 7) Pay
your invoice. You will receive an invoice with the due date after the
preliminary review booking is confirmed. SustainCERT is paid with a wire
transfer.
Step
8) Upload your documents for preliminary
review (How do I upload project documents?). Project Developers uploads the transition template
document under the ‘other documents’ section in the SC Platform.
The Transition review form is an additional file as PD shall also upload
required documents, i.e.,. PDD, LSC report (if required), cover letter, terms
and conditions for preliminary review.
Step 9) Project Developers book a subsequent review
for a date in the future, in the SC Platform, assuming the normal cycle.
Note: Project listing and GS validation both need to be completed first.