Voluntary Project Activity (VPA) / Component Project Activity (CPA)
The rule update for VPA/CPA introduces flexibility to Gold Standard for the Global Goals Programme of Activities (PoAs) requirements with regards to Validation/Verification Body (VVB) compliance check requirements for
inclusion of Voluntary Project Activities (VPAs)/
Component Project Activities (CPAs), documentation required for PoA
design change request and time of submission of design change request
for VPAs/CPAs.
Inclusion of VPAs/CPAs
The
Coordinating/Managing Entity (CME) may directly include VPAs/CPAs in the
registered PoA per the “PoA Certification Cycle” specified in PoA
requirements without a VVB compliance check if:
- At least one VPA/CPA of the registered PoA
has completed successful performance certification
AND
- The VPA/CPA that has completed performance
certification and the VPAs/CPAs that are included by the CME without VVB
compliance check shall:
- Involve the same technology/measure and
apply the same methodology in the case of single technology PoA
- Involve the same technologies/measures
and apply the same methodology(ies) combination in case of
multi-technology PoA
*Note: This rule update
enters into force on 13/08/2020.
It is mandatory to
submit a CPA (Component Project Activity) or VPA (Voluntary Project Activity)
for each country/technology/methodology combination at the time of Gold
Standard micro-POA registration review,
However,
case-by-case deviation may be granted after Technical Advisory Committee (TAC)
approval. Please refer to Section
17 of the Programme of Activity Requirements.
The VPA/CPA-level
design change request can be submitted following the applicable tracks as
specified below depending on the nature of the design change:
- Prior notification track – When material and permanent
changes to the VPA/CPA are made (e.g., changes like installed capacity
that will have an impact on all upcoming issuances etc.), the
Coordinating/Managing Entity (CME) shall submit the request for the design
change in advance of the CPA/VPA’s verification/performance certification
following Annex
A – Design Change Approval Procedure, Principles and Requirements.
- Issuance track – When the scope of the CPA/VPA
design change is limited to minor changes, the verifying Validation and
Verification Body (VVB) shall review and provide an opinion on the design
change as part of the verification. Such design change requests shall be
submitted in tandem with the request for performance certification of the
VPA/CPA.
"Minor changes" in a Voluntary Project Activities (VPAs)/ Component Project
Activities (CPA) design change
Minor changes are defined
as follows:
- Any corrections to project information of
a registered VPA/CPA that do not affect the design of the VPA/CPA
- Temporary deviations from the registered
monitoring plan for which alternative monitoring arrangements are
proposed, if the proposed alternative monitoring arrangements produce a
conservative estimate of greenhouse gas (GHG) emission reduction or net
anthropogenic GHG removal
- Changes to the monitoring of a registered
VPA/CPA that have no material impact on the applicability of the applied
methodologies or the other applied methodological regulatory documents, or
the accuracy and completeness of the monitoring
- Changes to the design of a registered
VPA/CPA that do not adversely impact any of the following:
- The applicability and application of the
applied methodologies, the applied standardized baselines and the other
applied methodological regulatory documents, under which the PoA has been
registered;
- The additionality of the VPA/CPA;
- The scale of VPA/CPA
- Changes to the VPA/CPA design to use the
positive list for demonstrating additionality
The Programme of
Activity (PoA) requirement states that a CPA/VPA may be submitted for inclusion
to the PoA at any time during the duration of the PoA by the CME.
A Verified Project Activity (VPA) can be submitted after a Programme of Activity (PoA) renewal. All new VPAs submitted for inclusion after the
end date of a crediting period of the PoA shall follow the latest version of
the PoA available at the time of submission for inclusion.
For example, if a new
VPA was listed before the end of the first crediting period of the PoA, but
submitted for inclusion after the start of the second crediting period of
the PoA, the VPA must be designed and included as per that PoA Design Document
version registered for the second crediting period.
In the case that the Verified Project Activity (VPA) start date begins before the Programme of Activity (PoA) crediting renewal period.
If the crediting
period start date of a new VPA is before the start date of the second crediting
period of the PoA, the VPA can submit retroactive issuance up to maximum two
(2) years before date of inclusion.
Such VPAs will not be
required to renew their next crediting period before the end of the second crediting
period of the PoA, which would allow VPAs to claim a maximum of up to 7
crediting years under the second crediting period of the PoA. However, under no
circumstances will VPAs be allowed to claim more than the maximum crediting
period allowed as per applicable activity and/or product requirements.
*A project/CPA is eligible to transition to GS4GG if a Programme of Activity (PoA) started before
01 January 2016.
Small Scale threshold
There are three
eligible project types:
- Type
I: Renewable energy project with a maximum output capacity of 15 MW
(or equivalent).
- Type
II: Energy-efficiency improvement project activities that reduce
energy consumption, on the supply and/or demand side, with a maximum energy
saving of 60 GWh per year (or an appropriate equivalent) in any year of the
crediting period. In this context, for project activities that improve thermal
energy efficiency, the maximum energy saving of 60 GWh(e) per year is
equivalent to 180 GWh(th) per year savings.
- Type
III: Other project activities. For example, the project involves
technologies such Safe Water Supply, Waste management, etc. not included in
Type I or Type II that result in GHG emission reductions not exceeding 60,000
ton CO2e per year in any year of the crediting period.
For more clarification, you can contact us at help@sustain-cert.com