Can the project be submitted for Preliminary Review without conducting a physical meeting and stakeholder feedback round?
Yes. The project developer may submit the project/Component Project Activity (CPA)/Voluntary Project Activity (VPA) for Preliminary Review without conducting the physical meeting and stakeholder feedback round. The project developer shall submit the draft Stakeholder Consultation Report with the self-assessment of Sustainable Development Goals and safeguards assessment with other required documents for preliminary review.
- Related Articles
- What happens if the stakeholder consultation cannot be conducted?- The Project developer may apply the following interim measures in cases where physical stakeholder consultation meetings cannot reasonably be conducted by projects due to COVID-19, and the projects are submitted for preliminary review before the end ... 
- What documents must be submitted for Preliminary Review?- The following documents must be submitted: Preliminary Review Required Documents Local Stakeholder Consultation Report Preliminary Review Form Design Review Required Documents Gold Standard Project Document Emission Reduction Calculation Excel File ... 
- Preliminary Review Submission Process- Preliminary Review Submission Process To submit the correct documentation to start a preliminary review process, there are a series of 9 steps that need to be done prior to initiating. In this section, you will find the detailed steps to take.  Steps ... 
- What are the project documentation requirements for projects submitted for Preliminary Review before 01 January 2021?- All Project Design Documents (PDDs) or PoA Design Documents (PoA-DDs, CPA/VPA-DDs), where the time of first submission (for Preliminary Review) is before 01 January 2021 shall apply the IPCC AR5 GWP values to PDDs/PoA-DDs and CPA/VPA-DDs, as ... 
- How can I add a transition review? - When adding a transition review on the “Add Review” button, you can choose between two types: Transition Review (Previous GS VER to GS4GG) Transition Review (GS CDM to GS VER) When adding a preliminary review that has a transition scheme, a ...