Can the project be submitted for Preliminary Review without conducting a physical meeting and stakeholder feedback round?
Yes. The project developer may submit the project/Component Project Activity (CPA)/Voluntary Project Activity (VPA) for Preliminary Review without conducting the physical meeting and stakeholder feedback round. The project developer shall submit the draft Stakeholder Consultation Report with the self-assessment of Sustainable Development Goals and safeguards assessment with other required documents for preliminary review.
Related Articles
What happens if the stakeholder consultation cannot be conducted?
The Project developer may apply the following interim measures in cases where physical stakeholder consultation meetings cannot reasonably be conducted by projects due to COVID-19, and the projects are submitted for preliminary review before the end ...
What documents must be submitted for Preliminary Review?
The following documents must be submitted: Preliminary Review Required Documents Local Stakeholder Consultation Report Preliminary Review Form Design Review Required Documents Gold Standard Project Document Emission Reduction Calculation Excel File ...
Preliminary Review Submission Process
Preliminary Review Submission Process To submit the correct documentation to start a preliminary review process, there are a series of 9 steps that need to be done prior to initiating. In this section, you will find the detailed steps to take. Steps ...
What are the project documentation requirements for projects submitted for Preliminary Review before 01 January 2021?
All Project Design Documents (PDDs) or PoA Design Documents (PoA-DDs, CPA/VPA-DDs), where the time of first submission (for Preliminary Review) is before 01 January 2021 shall apply the IPCC AR5 GWP values to PDDs/PoA-DDs and CPA/VPA-DDs, as ...
How can I add a transition review?
When adding a transition review on the “Add Review” button, you can choose between two types: Transition Review (Previous GS VER to GS4GG) Transition Review (GS CDM to GS VER) When adding a preliminary review that has a transition scheme, a ...