Yes, The Gold Standard Project shall demonstrate Ongoing Financial Need, or Financial Additionality, at Certification Renewal. In order to demonstrate ongoing financial need, the project shall provide a qualitative narrative, supported by an ...
Yes. Sustainable Development Goal contributions shall be demonstrated for the representative baseline situations of the project activity. If the project-specific baseline information does not exist anymore, the assessment shall be carried out, if ...
Per Section 6.0 of GHG Emission Reduction and Sequestration Product Requirements, Gold Standard Projects that generate GHGs emission reductions are eligible to claim credits for no more than: The maximum Certification Renewals/Cycles as stipulated in ...
A retroactive project is one that has started operating before a Gold Standard stakeholder consultation has taken place. All Verified Emission Reductions (VER) projects must submit project documentation for Preliminary Review within 1 year of the ...
A Transition Template is used to close gaps between previous Standard versions and GS4GG without requiring project developers to resubmit their project documentation using new GS4GG templates. The Transition Template is only required when projects ...