Where should we send Preliminary Review documentation?

Where should we send Preliminary Review documentation?

Create a project page on the Sustain Cert App. Upload complete documentation and book Preliminary Review. An invoice will be sent to you and your booking will be confirmed.  

    • Related Articles

    • Preliminary Review Submission Process

      Preliminary Review Submission Process To submit the correct documentation to start a preliminary review process, there are a series of 9 steps that need to be done prior to initiating. In this section, you will find the detailed steps to take.  Steps ...
    • What are the project documentation requirements for projects submitted for Preliminary Review before 01 January 2021?

      All Project Design Documents (PDDs) or PoA Design Documents (PoA-DDs, CPA/VPA-DDs), where the time of first submission (for Preliminary Review) is before 01 January 2021 shall apply the IPCC AR5 GWP values to PDDs/PoA-DDs and CPA/VPA-DDs, as ...
    • How can I add a transition review?

      When adding a transition review on the “Add Review” button, you can choose between two types: Transition Review (Previous GS VER to GS4GG) Transition Review (GS CDM to GS VER) When adding a preliminary review that has a transition scheme, a ...
    • What documents must be submitted for Preliminary Review?

      The following documents must be submitted: Preliminary Review Required Documents Local Stakeholder Consultation Report Preliminary Review Form Design Review Required Documents Gold Standard Project Document Emission Reduction Calculation Excel File ...
    • How long will it take? Our timeframe expectations

      Timeframe Expectations Stakeholder Feedback Round The Stakeholder Feedback Round (SFR) must take a minimum of 2 weeks to complete; it must also be closed and reported on before validation is completed. However, we recommend – as a minimum - that the ...