What does the process of Certification look like?

What does the process of Certification look like?

The detailed description of the certification process, including the various steps and the documentation required at each step, can be found here.

 

The basic steps of the certification process are as follows:

  • Plan project and hold Stakeholder Consultation
  • Preliminary Review by SustainCERT
  • Preliminary design approval
  • Third party validation conducted by an accredited validation and verification body (VVB)
  • Project design review by SustainCERT
  • Design certification

 

Once a project has been certified, the project will also have to be monitored, validated, and reviewed.

    • Related Articles

    • Expedited Service of Certification Reviews

      Guideline for Expedited Service of Certification Reviews SustainCERT (SC), serving as the Certification Body for Gold Standard for the Global Goals (GS4GG), extends expedited services for certification reviews to our clients, enabling Project ...
    • Preliminary Review Submission Process

      Preliminary Review Submission Process To submit the correct documentation to start a preliminary review process, there are a series of 9 steps that need to be done prior to initiating. In this section, you will find the detailed steps to take.  Steps ...
    • VVB Process Flow (Validation and Verification)

      Validation and Verification To begin a validation and/or verification service with SustainCERT, a Validation/verification request must be booked in the SC App. Steps 1. Once the booking is requested, an invoice is generated automatically in the SC ...
    • VVB Examination Process

      VVB Examination Process In this section, you will find the pertinent details and procedures for becoming a VVB and how to take the Gold Standard Validation and Verification Body (VVB) Online Exam. Steps Follow the Validation/Verification Body ...
    • How long will it take? Our timeframe expectations

      Timeframe Expectations Stakeholder Feedback Round The Stakeholder Feedback Round (SFR) must take a minimum of 2 weeks to complete; it must also be closed and reported on before validation is completed. However, we recommend – as a minimum - that the ...