What documents must be submitted for Preliminary Review?
The following documents must be submitted:
Preliminary Review
Required Documents
Local Stakeholder
Consultation Report
Preliminary Review
Form
Design Review
Required Documents
Gold Standard
Project Document
Emission Reduction
Calculation Excel File
Gold Standard
Validation Report
SDG Tool
Cover Letter
Terms and
Conditions
ODA declaration
Related Articles
Preliminary Review Submission Process
Preliminary Review Submission Process To submit the correct documentation to start a preliminary review process, there are a series of 9 steps that need to be done prior to initiating. In this section, you will find the detailed steps to take. Steps ...
In what language must documents be submitted?
As of right now, all submitted documents must be in English. Some documents, for example Environmental Impact Assessment (EIA) reports or expert opinions, can be in local languages but must also have an English translation.
What are the project documentation requirements for projects submitted for Preliminary Review before 01 January 2021?
All Project Design Documents (PDDs) or PoA Design Documents (PoA-DDs, CPA/VPA-DDs), where the time of first submission (for Preliminary Review) is before 01 January 2021 shall apply the IPCC AR5 GWP values to PDDs/PoA-DDs and CPA/VPA-DDs, as ...
How can I add a transition review?
When adding a transition review on the “Add Review” button, you can choose between two types: Transition Review (Previous GS VER to GS4GG) Transition Review (GS CDM to GS VER) When adding a preliminary review that has a transition scheme, a ...
Can the project be submitted for Preliminary Review without conducting a physical meeting and stakeholder feedback round?
Yes. The project developer may submit the project/Component Project Activity (CPA)/Voluntary Project Activity (VPA) for Preliminary Review without conducting the physical meeting and stakeholder feedback round. The project developer shall submit the ...