As of right now, all submitted documents must be in English. Some documents, for example Environmental Impact Assessment (EIA) reports or expert opinions, can be in local languages but must also have an English translation.
The following documents must be submitted: Preliminary Review Required Documents Local Stakeholder Consultation Report Preliminary Review Form Design Review Required Documents Gold Standard Project Document Emission Reduction Calculation Excel File ...
All Project Design Documents (PDDs) or PoA Design Documents (PoA-DDs, CPA/VPA-DDs), where the time of first submission (for Preliminary Review) is before 01 January 2021 shall apply the IPCC AR5 GWP values to PDDs/PoA-DDs and CPA/VPA-DDs, as ...
Yes. The project developer may submit the project/Component Project Activity (CPA)/Voluntary Project Activity (VPA) for Preliminary Review without conducting the physical meeting and stakeholder feedback round. The project developer shall submit the ...
Preliminary Review Submission Process To submit the correct documentation to start a preliminary review process, there are a series of 9 steps that need to be done prior to initiating. In this section, you will find the detailed steps to take. Steps ...
With a successful Preliminary Review, the Project will obtain ‘Listed’ status in the Gold Standard Registry. This means that the Key Project Information, draft Project Design Documentation, and supporting documentation are made publicly available, ...