How can I overwrite existing document with updated documents

How can I overwrite existing document with updated documents

Considering the below situations:

a. When a wrong document has been uploaded by mistake.

b.  An updated version of the document needs to be uploaded.

The solution to the above problems is to overwrite the existing uploaded document with a new one.


You can overwrite the documents for the review until the review initiation date only. After the review initiation date, you won’t be able to overwrite any document. 


For example, the review initiation date is 12th Nov 2019, so you can overwrite any document before 12th Nov 2019. After the review has been initiated, you can't overwrite any document. However, you can still upload new documents.

 

In case of any problem while working with documents, please write a mail to help@sustain-cert.com


Best Regards,

The sutainCERT team



    • Related Articles

    • Can I replace the uploaded document with a new one?

      Document uploaded in a review can be replaced with a new/updated document. To replace an existing document, go to the Documents section under a review. Under the section where the document was uploaded, you will see the document name which was ...
    • Where do I upload Crediting Period/Design Certification Renewal documents?

      Currently the SustainCERT App does not have a review section for Crediting Period/Design Certification Renewal.  This will be addressed in future versions.  All Renewal documents (for example: updated PDD, FVR etc) should be uploaded to an open ...
    • Where can I upload review and project related documents?

      Once the review is booked, you can upload all documents under the Documents section of the review as shown below. Documents can be uploaded in two sections, Required and Other. In the Required section, you will find different documents types which ...
    • How many documents can I upload for a review?

      We have now removed the document upload restriction. You can now upload as many documents as you like. 1. Go to the DOCUMENTS section of an open review and click on UPLOAD DOCUMENTS button. 2. Scroll to the bottom left and click the button named ADD ...
    • Where do I find all documents related to a project?

      You can find all documents under Preliminary Review of the respective project. To view the documents, open Preliminary review. Under DOCUMENTS section, you will see a document named GSXXXX_HistoricalDocuments.zip as shown below. where XXX is the GSID ...