How can I add a transition review?

How can I add a transition review?

When adding a transition review on the “Add Review” button, you can choose between two types: 
  1. Transition Review (Previous GS VER to GS4GG) 
  2. Transition Review (GS CDM to GS VER)

When adding a preliminary review that has a transition scheme, a disclaimer will remind you to select an option from the create project box.


In the case the transition scheme is other than NONE, the required documents of the preliminary review will be different. 
























For more clarification or any other queries, you can contact us at help@sustain-cert.com


    • Related Articles

    • Preliminary Review Submission Process

      Preliminary Review Submission Process To submit the correct documentation to start a preliminary review process, there are a series of 9 steps that need to be done prior to initiating. In this section, you will find the detailed steps to take.  Steps ...
    • Verified Project Activity (VPA)

      Voluntary Project Activity (VPA) / Component Project Activity (CPA) The rule update for VPA/CPA introduces flexibility to Gold Standard for the Global Goals Programme of Activities (PoAs) requirements with regards to Validation/Verification Body ...
    • Where should we send Preliminary Review documentation?

      Create a project page on the Sustain Cert App. Upload complete documentation and book Preliminary Review. An invoice will be sent to you and your booking will be confirmed.  
    • How long will it take? Our timeframe expectations

      Timeframe Expectations Stakeholder Feedback Round The Stakeholder Feedback Round (SFR) must take a minimum of 2 weeks to complete; it must also be closed and reported on before validation is completed. However, we recommend – as a minimum - that the ...
    • What are the project documentation requirements for projects submitted for Preliminary Review before 01 January 2021?

      All Project Design Documents (PDDs) or PoA Design Documents (PoA-DDs, CPA/VPA-DDs), where the time of first submission (for Preliminary Review) is before 01 January 2021 shall apply the IPCC AR5 GWP values to PDDs/PoA-DDs and CPA/VPA-DDs, as ...