Can I replace the uploaded document with a new one?

Can I replace the uploaded document with a new one?

Document uploaded in a review can be replaced with a new/updated document.
To replace an existing document, go to the Documents section under a review.
Under the section where the document was uploaded, you will see the document name which was uploaded.

Click on the button on the right side of the document and the document browse window will get opened.

You can select a new or updated document and upload the same.

Note: A document can only be replaced will the review is ongoing.
            Once the review is completed, you can't replace any existing document.

    • Related Articles

    • How can I overwrite existing document with updated documents

      Considering the below situations: a. When a wrong document has been uploaded by mistake. b.  An updated version of the document needs to be uploaded. The solution to the above problems is to overwrite the existing uploaded document with a new one. ...
    • How does one submit documents for Preliminary Review?

      Step 1) Confirm a Gold Standard Registry Account has been opened and the account is active (How to Open a Gold Standard Registry Account?) Step 2) Confirm an SC Platform Account is opened and login name and password are available Step 3) Login ...
    • How do I create a new Project on sustainCERT application?

      You can create a new project on sustainCERT application on your own. You need to log in to the platform and perform the below steps: STEP 1: STEP 2:  STEP 3: A new project will be created for you. You can now book reviews. Hope this article is ...
    • Where do I upload documents on the new Gold Standard Impact Registry?

      The Gold Standard Impact Registry has been designed to track environmental assets (like Verified Emission Reductions [VERs]) and the climate and development impacts of Gold Standard certified projects.  All project documents are now uploaded and ...
    • Where do I upload documents on the new Gold Standard Impact Registry?

      The Gold Standard Impact Registry has been designed to track environmental assets (like VERs) and the climate and development impacts of Gold Standard certified projects.   All project documents are now uploaded and hosted on the SustainCERT App.   ...