Methane recovery project activities shall be eligible for emission reductions from both methane avoidance (including from the flared biogas fraction) and non-renewable fuel substitution as long as evidence is provided on time for validation to demonstrate that the system was designed in a way to at least make use of some of the biogas recovered for the delivery of energy services (e.g. electricity, heat).